Quick Links TOC

475 Brannan Street

  Elevators

The building is equipment with (4) four hydraulic elevators.

  • Elevator #1 accesses the basement garage to the 1st floor.
  • Elevators #2 - #4 access the 1st floor to the 4th floor.
  • Elevator #2 also serves as a freight elevator and is electrically backed up by the building emergency generator.

Click here to view the Freight Elevator Dimesnions.

View Full Site Suggestion Box
© 2024
All rights reserved.